Shuvatara School Building
// Sanepa Lalitpur
Client Shuvatara School
Status Complete
Floor area 29,000 sq. ft
Commenced January 2004
Completed April 2005
The Shuvatara School building in Sanepa, Lalitpur was planned as per the changing demands of modern educational institutions. The three basement levels are designed in such a away that the entire basement area is fully utilized, while the ground-level difference within the plot was utilised to give a different outlook to the building.